{"id":23295,"date":"2026-08-24T09:11:53","date_gmt":"2026-08-24T07:11:53","guid":{"rendered":"https:\/\/meferi.com\/?p=23295"},"modified":"2026-08-24T12:42:01","modified_gmt":"2026-08-24T10:42:01","slug":"7-common-mistakes-when-evaluating-a-automation-project","status":"publish","type":"post","link":"https:\/\/meferi.com\/ru\/2026\/08\/7-common-mistakes-when-evaluating-a-automation-project\/","title":{"rendered":"7 Common Mistakes When Evaluating a Automation Project"},"content":{"rendered":"<div class=\"wpb-content-wrapper\" id=\"wpb-content-root\"><div class=\"vc_row wpb_row row top-row gradient-container-1 wpb_custom_034b39d9bc6c6b310d69e39f0ccf274f\"><div class=\"gradient-column-1 vc_column_container col-md-12\"><div class=\"wpb_wrapper vc_column-inner\">\r\n\t<div class=\"wpb_text_column wpb_content_element wpb_custom_7c91d232724f73626cc933bd95b25ff0\" >\r\n\t\t<div class=\"wpb_wrapper\">\r\n\t\t\t<blockquote>\n<p><strong>As we work on warehouse automation projects, we often see the same pattern: companies want to start by choosing and purchasing robots. In reality, that is already the middle of the process, not the beginning.<\/strong><\/p>\n<p><strong>To get the most from automation, it is important to understand how the warehouse operates today, which tasks are best suited for automation, and what specific results the project is expected to deliver.<\/strong><\/p>\n<p><strong>We have brought together a set of practical recommendations based on customer experience and the challenges companies most often face during implementation. They can help businesses prepare for automation more effectively and build a clearer understanding of what a well-designed project can actually achieve.<\/strong><\/p>\n<\/blockquote>\n<p><span style=\"font-weight: 400;\">Warehouse automation rarely starts with purchasing a robot. It usually begins with identifying existing pain points: where is the facility losing time, money, and productivity \u2014 and why?<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Employees may spend too much time walking between storage locations. Goods may sit idle waiting to be moved. Orders may accumulate before sorting. Labor shortages become more severe during peak periods. Errors increase in certain operations, while higher throughput requires an almost proportional increase in headcount.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">These are the situations that lead companies to consider warehouse automation \u2014 using robots and other technologies to automate individual operations and improve process efficiency.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">However, the decision to automate is not as simple as it may initially appear. The cost of equipment is only one of many factors that must be considered. Below are seven common mistakes companies make when evaluating automation projects \u2014 and that can ultimately prevent those projects from delivering the expected results.<\/span><\/p>\n<h2><b>Mistake No. 1: Starting with Equipment Selection<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Automation is not simply about introducing new equipment. Its effectiveness depends on how warehouse operations are organized, what problems need to be solved, and what constraints exist at a particular facility.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">That is why project evaluation should begin not with equipment selection, but with identifying the operational problems.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">It is also important to understand that the benefits of automation do not always come from directly replacing employees with robots. More often, automation changes the way the entire operation is organized.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Take manual order picking as an example. A picker does more than simply take goods from a storage location. They follow a route, locate the required item, navigate around equipment and other workers, wait for replenishment, return to the consolidation area, and transfer the completed order to the next stage.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">On paper, all of this may be classified as one operation: \u201corder picking.\u201d In practice, only part of that time is spent actually picking products. The rest is consumed by walking, waiting, and internal movement.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">With a goods-to-person solution, items are delivered directly to the operator. Employees no longer need to walk long distances across the warehouse or follow extended picking routes. Instead, they remain at a workstation and perform the task for which the station was designed: selecting the required quantity of items and confirming the pick.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The economic benefit does not come simply from \u201creplacing a picker with a robot.\u201d It comes from enabling one operator to process more order lines per hour while reducing the cost per line.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The same principle applies to autonomous mobile robots (AMRs). An AMR may not directly reduce headcount, but it can eliminate the need for employees to manually move carts between receiving, storage, picking, packing, and shipping areas.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">As a result, employees spend less time waiting for transport, leave their work areas less frequently, and perform their core tasks with fewer interruptions.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">This is why the same type of robot may deliver excellent results in one warehouse and fail to meet expectations in another. First identify the constraint. Then select the technology that addresses it.<\/span><\/p>\n<h2><b><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-23356\" src=\"https:\/\/meferi.com\/wp-content\/uploads\/2026\/08\/51546764-bb3e-4a3b-b4ab-50f9569dd7b3_0003_9ab0a85e-c3cc-465e-8c25-ba5641f57ce5-900x506.jpg\" alt=\"Low-profile autonomous warehouse robot designed for pallet transport\" width=\"900\" height=\"506\" srcset=\"https:\/\/meferi.com\/wp-content\/uploads\/2026\/08\/51546764-bb3e-4a3b-b4ab-50f9569dd7b3_0003_9ab0a85e-c3cc-465e-8c25-ba5641f57ce5-900x506.jpg 900w, https:\/\/meferi.com\/wp-content\/uploads\/2026\/08\/51546764-bb3e-4a3b-b4ab-50f9569dd7b3_0003_9ab0a85e-c3cc-465e-8c25-ba5641f57ce5-768x432.jpg 768w, https:\/\/meferi.com\/wp-content\/uploads\/2026\/08\/51546764-bb3e-4a3b-b4ab-50f9569dd7b3_0003_9ab0a85e-c3cc-465e-8c25-ba5641f57ce5-640x360.jpg 640w, https:\/\/meferi.com\/wp-content\/uploads\/2026\/08\/51546764-bb3e-4a3b-b4ab-50f9569dd7b3_0003_9ab0a85e-c3cc-465e-8c25-ba5641f57ce5-400x225.jpg 400w\" sizes=\"auto, (max-width: 900px) 100vw, 900px\" \/><\/b><\/h2>\n<h2><b>Mistake No. 2: Failing to Analyze Current Processes<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Without baseline data on current warehouse operations, evaluating the benefits of automation becomes little more than educated guesswork.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">To understand what automation can change \u2014 and whether the investment will pay off \u2014 measurable evaluation criteria are essential.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The analysis often reveals that the economic benefit does not come from formally replacing one employee with one machine, but from changing the entire process: travel routes, labor utilization, processing speed, and coordination between functional areas.<\/span><\/p>\n<p><b>At a minimum, collect the following data:<\/b><\/p>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">What is the workload of the area? How many orders, order lines, cartons, or pallets are processed per shift?<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">What is the actual productivity? How many units are processed per labor hour?<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">How long does each operation take?<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">How is working time allocated? What share is spent directly on picking, sorting, or packing, and what share is lost to walking, waiting, searching for goods, or correcting errors?<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">What are the length and structure of employee and equipment routes?<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">How often do errors, returns, and mis-picks occur?<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">What does it cost to process one order, order line, carton, or pallet?<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">What additional costs exist? How much is spent on overtime and temporary labor, and what are the costs of equipment and labor downtime?<\/span><\/li>\n<\/ol>\n<p><span style=\"font-weight: 400;\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-23309\" src=\"https:\/\/meferi.com\/wp-content\/uploads\/2026\/08\/51546764-bb3e-4a3b-b4ab-50f9569dd7b3_0002_1d58fd71-ab03-44aa-9f8d-07c83cafab31-900x506.jpg\" alt=\"Pallets, cartons and roll cages staged across a warehouse aisle\" width=\"900\" height=\"506\" srcset=\"https:\/\/meferi.com\/wp-content\/uploads\/2026\/08\/51546764-bb3e-4a3b-b4ab-50f9569dd7b3_0002_1d58fd71-ab03-44aa-9f8d-07c83cafab31-900x506.jpg 900w, https:\/\/meferi.com\/wp-content\/uploads\/2026\/08\/51546764-bb3e-4a3b-b4ab-50f9569dd7b3_0002_1d58fd71-ab03-44aa-9f8d-07c83cafab31-768x432.jpg 768w, https:\/\/meferi.com\/wp-content\/uploads\/2026\/08\/51546764-bb3e-4a3b-b4ab-50f9569dd7b3_0002_1d58fd71-ab03-44aa-9f8d-07c83cafab31-640x360.jpg 640w, https:\/\/meferi.com\/wp-content\/uploads\/2026\/08\/51546764-bb3e-4a3b-b4ab-50f9569dd7b3_0002_1d58fd71-ab03-44aa-9f8d-07c83cafab31-400x225.jpg 400w\" sizes=\"auto, (max-width: 900px) 100vw, 900px\" \/><\/span><\/p>\n<p><span style=\"font-weight: 400;\">Two scenarios should then be compared over the same period: operations without automation and operations after implementation.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The baseline scenario should account not only for current costs, but also for how those costs are expected to change as volumes grow. How many additional employees will need to be hired? Will another shift be required? Will overtime, training, and quality-control costs increase?<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The automation scenario should include capital investment, operating expenses, remaining labor costs, and the expected increase in productivity.<\/span><\/p>\n<h2><b>Mistake No. 3: Assuming a Robot Should Replace a Human<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Warehouse automation should not be evaluated solely by its ability to reduce headcount.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Sometimes the main benefit is that, as volumes grow, the company does not need to hire another 20 or 30 employees. For a rapidly growing warehouse, avoiding additional hiring can be more valuable than direct headcount reduction.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">With robotics, warehouse logistics becomes a coordinated system of people, equipment, and information systems.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">A robot receives tasks from the WMS, moves goods, containers, or pallets, confirms completion, and transfers the load to the next stage. Employees continue to perform activities that require visual inspection, handling of non-standard goods, decision-making, or exception management.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">As a result, the number of employees may not change at all. What changes is how their working time is used.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Before automation, an employee may spend a significant part of their shift walking, waiting for a cart, or searching for available equipment. After automation, many of these non-value-adding activities can be reduced.<\/span><\/p>\n<p><b><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-23358\" src=\"https:\/\/meferi.com\/wp-content\/uploads\/2026\/08\/51546764-bb3e-4a3b-b4ab-50f9569dd7b3_0000_\u0421\u043b\u043e\u0439-4-900x506.jpg\" alt=\"Robotic forklift placing a pallet of boxes onto a warehouse rack\" width=\"900\" height=\"506\" srcset=\"https:\/\/meferi.com\/wp-content\/uploads\/2026\/08\/51546764-bb3e-4a3b-b4ab-50f9569dd7b3_0000_\u0421\u043b\u043e\u0439-4-900x506.jpg 900w, https:\/\/meferi.com\/wp-content\/uploads\/2026\/08\/51546764-bb3e-4a3b-b4ab-50f9569dd7b3_0000_\u0421\u043b\u043e\u0439-4-768x432.jpg 768w, https:\/\/meferi.com\/wp-content\/uploads\/2026\/08\/51546764-bb3e-4a3b-b4ab-50f9569dd7b3_0000_\u0421\u043b\u043e\u0439-4-640x360.jpg 640w, https:\/\/meferi.com\/wp-content\/uploads\/2026\/08\/51546764-bb3e-4a3b-b4ab-50f9569dd7b3_0000_\u0421\u043b\u043e\u0439-4-400x225.jpg 400w\" sizes=\"auto, (max-width: 900px) 100vw, 900px\" \/><\/b><\/p>\n<p><b>Automation can improve labor productivity in several ways:<\/b><\/p>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The same order volume can be processed by a smaller shift workforce.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The existing workforce can handle higher throughput.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The need for seasonal hiring can be reduced.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Overtime can be reduced.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">New employees can reach the required productivity level faster.<\/span><\/li>\n<\/ol>\n<h2><b>Mistake No. 4: Considering Only the Cost of Purchasing Robots<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Many companies begin budget planning with the price of robotic equipment. But that is only one part of the total project cost.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">If design, implementation, integration, infrastructure, and ongoing operating expenses are ignored, the economic assessment will be incomplete.<\/span><\/p>\n<h3><b>Hidden Equipment and Infrastructure Costs<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">A robot may appear to be a ready-to-use device that simply needs to be delivered to the warehouse. In reality, industrial operation begins with preparing the environment in which the equipment must operate safely and reliably.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Depending on the system, this may include charging stations, batteries, on-premises or cloud infrastructure, wireless access points, positioning systems, and safety equipment.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">In some projects, preparing the facility can require investment comparable to the cost of the robots themselves.<\/span><\/p>\n<p><b>Possible modifications include:<\/b><\/p>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Floor leveling or repairs;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Route markings;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Barriers and safety zones;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Racking modifications;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Automated gates;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Integration with elevators and conveyors;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Additional sensors;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Operator workstations;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Fire protection and evacuation measures.<\/span><\/li>\n<\/ol>\n<p><span style=\"font-weight: 400;\">Even when the warehouse itself is ready for robotic operations, additional project costs remain.<\/span><\/p>\n<p><span style=\"font-weight: 400;\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-23304\" src=\"https:\/\/meferi.com\/wp-content\/uploads\/2026\/08\/51546764-bb3e-4a3b-b4ab-50f9569dd7b3_0007_\u0424\u043e\u043d-900x506.jpg\" alt=\"Warehouse doorway with a concrete threshold and yellow protective bollards\" width=\"900\" height=\"506\" srcset=\"https:\/\/meferi.com\/wp-content\/uploads\/2026\/08\/51546764-bb3e-4a3b-b4ab-50f9569dd7b3_0007_\u0424\u043e\u043d-900x506.jpg 900w, https:\/\/meferi.com\/wp-content\/uploads\/2026\/08\/51546764-bb3e-4a3b-b4ab-50f9569dd7b3_0007_\u0424\u043e\u043d-768x432.jpg 768w, https:\/\/meferi.com\/wp-content\/uploads\/2026\/08\/51546764-bb3e-4a3b-b4ab-50f9569dd7b3_0007_\u0424\u043e\u043d-640x360.jpg 640w, https:\/\/meferi.com\/wp-content\/uploads\/2026\/08\/51546764-bb3e-4a3b-b4ab-50f9569dd7b3_0007_\u0424\u043e\u043d-400x225.jpg 400w\" sizes=\"auto, (max-width: 900px) 100vw, 900px\" \/><\/span><\/p>\n<h3><b>Design and Implementation Costs<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">System design and implementation are another area that is frequently underestimated.<\/span><\/p>\n<p><b>These costs may include:<\/b><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">site surveys;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">material-flow modeling;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">target-process design;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">integration with WMS, ERP, WCS, or WES platforms;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">configuration of task and status data exchange;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">scenario testing;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">development of emergency procedures;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">operator and technical staff training;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">pilot-zone deployment;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">go-live support;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">updates to operating procedures and job descriptions.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">The more complex the process, the larger the share of the total project budget that may be required for integration.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The robot must be integrated into the operation: it must know where to get a task, where to deliver the load, what to do when a destination point is occupied, how to respond to an obstacle, and how to report its status back to the host system.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Once implementation is complete, the project enters the operational stage, which brings its own ongoing costs.<\/span><\/p>\n<h3><b>Operating Costs<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Operating expenses may include maintenance, spare parts, batteries, software licenses, technical support, electricity, connectivity, software updates, and training for new employees.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Planned and unplanned downtime should also be considered. Even a reliable robotic system requires maintenance. The project therefore needs sufficient capacity reserves, service windows, and operating procedures for situations in which part of the fleet is unavailable.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Another important consideration is the financing model.<\/span><\/p>\n<h3><b>Purchase or RaaS: Choosing the Right Model<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Purchasing equipment is not the only option. Many companies also consider RaaS \u2014 Robotics as a Service. Under this model, the customer pays for the use of robotic equipment through a subscription, which may be based on the number of robots, operating hours, or completed operations.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The main advantage is lower upfront investment. Instead of purchasing the entire system at once, the company pays a recurring fee that may also include software, maintenance, repairs, and updates.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">However, over the long term, a subscription can cost more than purchasing the equipment outright. RaaS can also increase dependence on the provider. Service levels, price escalation terms, and the ability to expand the robot fleet quickly may all depend on the supplier.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The choice between purchasing and RaaS should reflect the project duration, seasonality, and expected workload.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">For stable and highly predictable operations, purchasing robots may be more cost-effective. For pilot projects, rapidly growing facilities, or highly seasonal operations, RaaS can reduce risk and allow the technology to be tested with lower upfront investment.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The cost of robotic equipment is therefore only one component of the project budget. A proper economic assessment should consider the entire lifecycle of the system \u2014 from facility preparation and implementation to operation and maintenance.<\/span><\/p>\n<h2><b>Mistake No. 5: Assessing the Economic Benefit Incorrectly<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Robots can reduce the time required to move goods, supply containers, transport pallets, sort shipments, perform inventory counts, and transfer loads between functional areas.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">However, automation should not be evaluated solely by its payback period, the number of robots deployed, or the number of employees removed from the process. Its impact is much broader.<\/span><\/p>\n<h3><b>Direct Effect: Reducing Cost per Operation<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">The direct economic effect of automation is largely associated with reducing the labor required for each operation. For this reason, one of the most useful indicators is cost per operation.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Warehouse economics are driven by repetition.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Saving a few seconds on one task may seem insignificant. Across thousands of operations per shift, dozens of employees, and hundreds of working days, those seconds can add up to entire shifts of labor.<\/span><\/p>\n<p><b>Useful unit-cost metrics may include:<\/b><\/p>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Cost per order line processed;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Cost per order picked;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Cost per pallet moved;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Cost per shipment sorted;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Cost per return processed;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Cost per storage location counted.<\/span><\/li>\n<\/ol>\n<p><span style=\"font-weight: 400;\">Suppose 10 employees in one area process 1,000 order lines per shift before automation. After automation, the same workforce processes 1,600.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Headcount has not changed, but labor cost per order line has fallen significantly. The company can process more orders without increasing shift size, hiring temporary staff, or adding overtime.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">These direct productivity improvements are the easiest to translate into monetary terms, but they represent only part of the overall impact of automation.<\/span><\/p>\n<h3><b><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-23359\" src=\"https:\/\/meferi.com\/wp-content\/uploads\/2026\/08\/51546764-bb3e-4a3b-b4ab-50f9569dd7b3_0001_\u0421\u043b\u043e\u0439-3-900x506.jpg\" alt=\"Autonomous mobile robot operating in a warehouse alongside a worker and pallets\" width=\"900\" height=\"506\" srcset=\"https:\/\/meferi.com\/wp-content\/uploads\/2026\/08\/51546764-bb3e-4a3b-b4ab-50f9569dd7b3_0001_\u0421\u043b\u043e\u0439-3-900x506.jpg 900w, https:\/\/meferi.com\/wp-content\/uploads\/2026\/08\/51546764-bb3e-4a3b-b4ab-50f9569dd7b3_0001_\u0421\u043b\u043e\u0439-3-768x432.jpg 768w, https:\/\/meferi.com\/wp-content\/uploads\/2026\/08\/51546764-bb3e-4a3b-b4ab-50f9569dd7b3_0001_\u0421\u043b\u043e\u0439-3-640x360.jpg 640w, https:\/\/meferi.com\/wp-content\/uploads\/2026\/08\/51546764-bb3e-4a3b-b4ab-50f9569dd7b3_0001_\u0421\u043b\u043e\u0439-3-400x225.jpg 400w\" sizes=\"auto, (max-width: 900px) 100vw, 900px\" \/><\/b><\/h3>\n<h3><b>Indirect Effect: More Stable and Controlled Processes<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Indirect benefits can sometimes be comparable to direct labor savings.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Automation reduces manual handoffs and makes the sequence of operations more transparent and controlled. The WMS generates a task, the robot performs the movement, and the system records the status and triggers the next step.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The fewer informal and untracked actions there are \u2014 \u201cleave it here,\u201d \u201cwe\u2019ll move it later,\u201d \u201cforgot to confirm\u201d \u2014 the greater the process transparency becomes.<\/span><\/p>\n<p><b>Automation can help reduce:<\/b><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">picking errors;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">mis-picks;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">product damage;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">returns caused by order-processing errors;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">lost containers and carts;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">delays when transferring loads between areas;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">downtime caused by unavailable transport;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">time spent manually investigating errors and failures.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">For an e-commerce operation, this can mean fewer cancellations and faster order fulfillment. A retail chain can replenish stores more consistently and reduce out-of-stock situations both on the sales floor and in the backroom. A 3PL operator can handle more customers without increasing headcount or expanding the facility.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">These improvements may not always appear immediately in financial statements, but over time they can have a significant effect on warehouse performance.<\/span><\/p>\n<h3><b><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-23357\" src=\"https:\/\/meferi.com\/wp-content\/uploads\/2026\/08\/51546764-bb3e-4a3b-b4ab-50f9569dd7b3_0002_\u0421\u043b\u043e\u0439-2-900x506.jpg\" alt=\"Autonomous pallet transport robot carrying a load through a warehouse\" width=\"900\" height=\"506\" srcset=\"https:\/\/meferi.com\/wp-content\/uploads\/2026\/08\/51546764-bb3e-4a3b-b4ab-50f9569dd7b3_0002_\u0421\u043b\u043e\u0439-2-900x506.jpg 900w, https:\/\/meferi.com\/wp-content\/uploads\/2026\/08\/51546764-bb3e-4a3b-b4ab-50f9569dd7b3_0002_\u0421\u043b\u043e\u0439-2-768x432.jpg 768w, https:\/\/meferi.com\/wp-content\/uploads\/2026\/08\/51546764-bb3e-4a3b-b4ab-50f9569dd7b3_0002_\u0421\u043b\u043e\u0439-2-640x360.jpg 640w, https:\/\/meferi.com\/wp-content\/uploads\/2026\/08\/51546764-bb3e-4a3b-b4ab-50f9569dd7b3_0002_\u0421\u043b\u043e\u0439-2-400x225.jpg 400w\" sizes=\"auto, (max-width: 900px) 100vw, 900px\" \/><\/b><\/h3>\n<h3><b>Strategic Effect: The Ability to Scale<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Strategic benefits are more difficult to express in monetary terms, but they can determine how well the facility performs several years into the future.<\/span><\/p>\n<p><span style=\"font-weight: 400;\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-23306\" src=\"https:\/\/meferi.com\/wp-content\/uploads\/2026\/08\/51546764-bb3e-4a3b-b4ab-50f9569dd7b3_0004_d30bdbe4-4928-418d-a68d-f7ab77ebe2c8-900x506.jpg\" alt=\"High-bay warehouse with pallet racks and a wide central aisle\" width=\"900\" height=\"506\" srcset=\"https:\/\/meferi.com\/wp-content\/uploads\/2026\/08\/51546764-bb3e-4a3b-b4ab-50f9569dd7b3_0004_d30bdbe4-4928-418d-a68d-f7ab77ebe2c8-900x506.jpg 900w, https:\/\/meferi.com\/wp-content\/uploads\/2026\/08\/51546764-bb3e-4a3b-b4ab-50f9569dd7b3_0004_d30bdbe4-4928-418d-a68d-f7ab77ebe2c8-768x432.jpg 768w, https:\/\/meferi.com\/wp-content\/uploads\/2026\/08\/51546764-bb3e-4a3b-b4ab-50f9569dd7b3_0004_d30bdbe4-4928-418d-a68d-f7ab77ebe2c8-640x360.jpg 640w, https:\/\/meferi.com\/wp-content\/uploads\/2026\/08\/51546764-bb3e-4a3b-b4ab-50f9569dd7b3_0004_d30bdbe4-4928-418d-a68d-f7ab77ebe2c8-400x225.jpg 400w\" sizes=\"auto, (max-width: 900px) 100vw, 900px\" \/><\/span><\/p>\n<p><b>In the long term, automation can provide several important advantages:<\/b><\/p>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Scalability.<\/b><span style=\"font-weight: 400;\"> As volumes grow, the company can add robots, workstations, or shifts without completely redesigning the process or sharply increasing headcount. This is especially important in markets where warehouse operators have difficulty recruiting and retaining employees.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>More stable operation during seasonal peaks.<\/b><span style=\"font-weight: 400;\"> Instead of urgently hiring large numbers of temporary employees, companies can increase fleet capacity, adjust schedules, and redistribute material flows between areas.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Greater operational visibility and control.<\/b><span style=\"font-weight: 400;\"> Robots do not operate in isolation but as part of the warehouse\u2019s digital environment. Tasks, movements, delays, and exceptions can be recorded in the information system.<\/span><\/li>\n<\/ol>\n<p><b>This gives management a clearer picture of facility operations and helps identify:<\/b><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">where queues occur;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">which routes are overloaded;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">how long an individual operation takes;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">which areas lack capacity;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">where employees or equipment remain idle.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Automation therefore does more than automate individual operations. It also produces data that can support more informed management decisions and future capacity planning.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Project evaluation should therefore consider both current savings and the long-term strategic benefits of automation.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Once all components of the economic impact have been identified, quantitative assessment can begin.<\/span><\/p>\n<h2><b>How to Assess the Economic Benefit: Payback Is Not Everything<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Payback period alone does not provide the full picture.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">A project may have a four-year payback period but eliminate, in its first year, a constraint that prevents the warehouse from handling growing volumes. Conversely, an attractive two-year payback calculation may fail to account for service, integration costs, and actual downtime.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">A complete assessment should therefore consider both financial indicators and changes in productivity, process quality, and future capacity.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">In simplified form:<\/span><\/p>\n<p><b><i>Total economic benefit = labor cost savings + avoided hiring costs + savings from fewer errors and less downtime + additional margin generated by higher throughput<\/i><\/b><\/p>\n<p><b>Useful indicators include:<\/b><\/p>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Payback period;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">ROI;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">NPV;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Internal rate of return (IRR);<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Cost per operation before and after automation;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Productivity per labor hour;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Productivity per square meter;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Maximum throughput of the area.<\/span><\/li>\n<\/ol>\n<h2><b>Mistake No. 6: Scaling Immediately Instead of Running a Pilot<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">One of the most common mistakes is deploying a robotic system across the entire warehouse from the outset.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Even when the selected technology looks promising, a pilot allows the company to verify whether expected productivity and economic results can actually be achieved under real operating conditions.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The pilot should focus on a process where the problem is already clear and measurable \u2014 for example, transporting containers between areas, order picking, shipment sorting, or inventory counting.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Before the pilot begins, establish baseline indicators:<\/span><\/p>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Number of operations per shift;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Processing time per unit;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Labor requirements;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Number of errors;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Waiting time;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Actual utilization of the area;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Cost per operation;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Productivity during peak periods.<\/span><\/li>\n<\/ol>\n<p><span style=\"font-weight: 400;\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-23308\" src=\"https:\/\/meferi.com\/wp-content\/uploads\/2026\/08\/51546764-bb3e-4a3b-b4ab-50f9569dd7b3_0003_7d74e7cb-fc82-435f-b21d-7662fbe697d7-900x506.jpg\" alt=\"Fenced warehouse test area with a pallet, scanners and marked lanes\" width=\"900\" height=\"506\" srcset=\"https:\/\/meferi.com\/wp-content\/uploads\/2026\/08\/51546764-bb3e-4a3b-b4ab-50f9569dd7b3_0003_7d74e7cb-fc82-435f-b21d-7662fbe697d7-900x506.jpg 900w, https:\/\/meferi.com\/wp-content\/uploads\/2026\/08\/51546764-bb3e-4a3b-b4ab-50f9569dd7b3_0003_7d74e7cb-fc82-435f-b21d-7662fbe697d7-768x432.jpg 768w, https:\/\/meferi.com\/wp-content\/uploads\/2026\/08\/51546764-bb3e-4a3b-b4ab-50f9569dd7b3_0003_7d74e7cb-fc82-435f-b21d-7662fbe697d7-640x360.jpg 640w, https:\/\/meferi.com\/wp-content\/uploads\/2026\/08\/51546764-bb3e-4a3b-b4ab-50f9569dd7b3_0003_7d74e7cb-fc82-435f-b21d-7662fbe697d7-400x225.jpg 400w\" sizes=\"auto, (max-width: 900px) 100vw, 900px\" \/><\/span><\/p>\n<p><span style=\"font-weight: 400;\">The robotic solution can then be implemented in the selected area. This gives the team an opportunity to test the system and make adjustments while allowing employees to become familiar with the new equipment.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Avoid drawing conclusions from the first day of operation. Employees need time to adapt, routes and operating rules need to stabilize, and some issues may only become visible when the system is running at full load.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Once the pilot reaches stable operating conditions, measure the same indicators again and compare them with the baseline.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Look not only at average productivity, but also at consistency: how the area performs throughout the shift, how it performs during peak periods, how often manual intervention is required, and what happens when part of the equipment is unavailable.<\/span><\/p>\n<h2><b>Mistake No. 7: Automating Processes That Are Not Suited to Automation<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">The decision should be based not on the desire to automate the warehouse at any cost, but on a clear understanding of the problem automation is expected to solve.<\/span><\/p>\n<p><b>Automation is most effective when an operation:<\/b><\/p>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">is repeated frequently;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">follows a clear route and sequence;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">requires significant labor;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">limits throughput;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">requires consistent SLA performance;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">is difficult to scale by adding personnel.<\/span><\/li>\n<\/ol>\n<p><span style=\"font-weight: 400;\">Sometimes the problem is not the technology but the underlying warehouse process.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">If operations are not standardized, automation may simply reinforce existing inefficiencies.<\/span><\/p>\n<p><span style=\"font-weight: 400;\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-23307\" src=\"https:\/\/meferi.com\/wp-content\/uploads\/2026\/08\/51546764-bb3e-4a3b-b4ab-50f9569dd7b3_0005_5c28f09e-51e2-40c8-8f6f-8c60daeebeef-900x506.jpg\" alt=\"Three pallets with differently arranged cardboard boxes in a warehouse\" width=\"900\" height=\"506\" srcset=\"https:\/\/meferi.com\/wp-content\/uploads\/2026\/08\/51546764-bb3e-4a3b-b4ab-50f9569dd7b3_0005_5c28f09e-51e2-40c8-8f6f-8c60daeebeef-900x506.jpg 900w, https:\/\/meferi.com\/wp-content\/uploads\/2026\/08\/51546764-bb3e-4a3b-b4ab-50f9569dd7b3_0005_5c28f09e-51e2-40c8-8f6f-8c60daeebeef-768x432.jpg 768w, https:\/\/meferi.com\/wp-content\/uploads\/2026\/08\/51546764-bb3e-4a3b-b4ab-50f9569dd7b3_0005_5c28f09e-51e2-40c8-8f6f-8c60daeebeef-640x360.jpg 640w, https:\/\/meferi.com\/wp-content\/uploads\/2026\/08\/51546764-bb3e-4a3b-b4ab-50f9569dd7b3_0005_5c28f09e-51e2-40c8-8f6f-8c60daeebeef-400x225.jpg 400w\" sizes=\"auto, (max-width: 900px) 100vw, 900px\" \/><\/span><\/p>\n<p><span style=\"font-weight: 400;\">Robots are not required in every warehouse or for every task. If volumes are low, flows are unstable, and tasks change constantly, integration costs may exceed the potential savings.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Automation will also struggle to deliver the expected results if the underlying process is not properly organized.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">If inventory records in the WMS are inaccurate, storage locations are not properly labeled, tasks are generated with delays, and employees rely on informal operating rules, a robot will simply automate the existing chaos.<\/span><\/p>\n<h2><b>How to Avoid These Mistakes<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Many mistakes in warehouse automation projects occur before a specific technology is even selected.<\/span><\/p>\n<p><b>The probability of successful implementation increases significantly if the company:<\/b><\/p>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Starts with process analysis.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Identifies the facility\u2019s actual constraints.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Evaluates the total cost of the project.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Considers direct, indirect, and strategic benefits.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Tests the selected solution in a pilot area before scaling.<\/span><\/li>\n<\/ol>\n<p><span style=\"font-weight: 400;\">Automation is not an end in itself. It is a tool for improving warehouse performance. The result depends not only on the capabilities of the equipment, but also on the quality of project preparation and how well the selected solution matches the requirements of the specific facility.<\/span><\/p>\n\r\n\t\t<\/div>\r\n\t<\/div>\r\n<\/div><\/div><\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"As we work on warehouse automation projects, we often see the same pattern: companies want to start by choosing and purchasing robots. In reality, that is already the middle of the process, not the beginning. To get the most from automation, it is important to understand how the warehouse operates today, which tasks are best [...]","protected":false},"author":28,"featured_media":23310,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[11],"tags":[],"class_list":["post-23295","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"acf":[],"featured_image_src":{"landsacpe":["https:\/\/meferi.com\/wp-content\/uploads\/2026\/08\/51546764-bb3e-4a3b-b4ab-50f9569dd7b3_0000_d1d45988-3ee0-44ba-bfec-d44b6d59f908-1140x445.jpg",1140,445,true],"list":["https:\/\/meferi.com\/wp-content\/uploads\/2026\/08\/51546764-bb3e-4a3b-b4ab-50f9569dd7b3_0000_d1d45988-3ee0-44ba-bfec-d44b6d59f908-463x348.jpg",463,348,true],"medium":["https:\/\/meferi.com\/wp-content\/uploads\/2026\/08\/51546764-bb3e-4a3b-b4ab-50f9569dd7b3_0000_d1d45988-3ee0-44ba-bfec-d44b6d59f908-900x506.jpg",900,506,true],"full":["https:\/\/meferi.com\/wp-content\/uploads\/2026\/08\/51546764-bb3e-4a3b-b4ab-50f9569dd7b3_0000_d1d45988-3ee0-44ba-bfec-d44b6d59f908.jpg",1200,675,false]},"_links":{"self":[{"href":"https:\/\/meferi.com\/ru\/wp-json\/wp\/v2\/posts\/23295","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/meferi.com\/ru\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/meferi.com\/ru\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/meferi.com\/ru\/wp-json\/wp\/v2\/users\/28"}],"replies":[{"embeddable":true,"href":"https:\/\/meferi.com\/ru\/wp-json\/wp\/v2\/comments?post=23295"}],"version-history":[{"count":3,"href":"https:\/\/meferi.com\/ru\/wp-json\/wp\/v2\/posts\/23295\/revisions"}],"predecessor-version":[{"id":23420,"href":"https:\/\/meferi.com\/ru\/wp-json\/wp\/v2\/posts\/23295\/revisions\/23420"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/meferi.com\/ru\/wp-json\/wp\/v2\/media\/23310"}],"wp:attachment":[{"href":"https:\/\/meferi.com\/ru\/wp-json\/wp\/v2\/media?parent=23295"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/meferi.com\/ru\/wp-json\/wp\/v2\/categories?post=23295"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/meferi.com\/ru\/wp-json\/wp\/v2\/tags?post=23295"}],"curies":[{"name":"WP","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}